Month / July 2019
-
Scotch House, Burgh Quay, Dublin
Scotch House, Burgh Quay, Dublin This project involved the installation of containment lighting power, data, wiring of desks, ambient lighting systems, intercom systems, PA systems, fire alarm, intruder alarm. This is an…July 10, 2019 -
WeWork, Berlin
WeWork, Berlin This project involved installation of containment lighting power, data, wiring of desks, ambient lighting systems, intercom systems, PA systems, fire alarm, intruder alarm. Centum provided 20 operatives on this job…July 10, 2019 -
Boston Scientific, Galway
Boston Scientific, Galway Centum provided 15 operatives for this project for the duration of 4 months. This project involved these operatives carrying out specialist pharmaceutical work which included, containment, lighting, HB cabling,…July 10, 2019 -
BIO-GEN Pharmaceutical, Switzerland
BIO-GEN Pharmaceutical, Switzerland This project involved 50 operatives onsite for 3 months, carrying out specialist pharmaceutical work which included, containment, lighting, HB cabling, power, buzz bar install. Centum organised flights, accommodation and…July 10, 2019 -
Liverpool University Hospital, Liverpool
Liverpool University Hospital, Liverpool Centum provided general lighting power, fire alarm system, BMS wiring and data installation on this project. This job was over a period of 8 months where we provided…July 10, 2019 -
King’s College Hospital, London
King’s College Hospital, London Centum provided general lighting power, fire alarm system, BMS wiring and data installation on this project. • Principle M&E Contractor: Blackbourne M&E • Contract Value: £2 millionJuly 10, 2019 -
Amazon, Blanchardstown
Amazon, Blanchardstown Centum provided electrical labour for the installation of containment on this project along with general lighting power and battery back-up, and generator system install. This was a large-scale project. The…July 10, 2019 -
Microsoft, Grange Castle, Dublin
Microsoft, Grange Castle, Dublin Centum provided electrical labour for the installation of containment on this project along with general lighting power and battery back-up, and generator system install. This was a large-scale…July 10, 2019